[Feb 14, 2023] HPE0-S60 Exam Dumps - HP Practice Test Questions
New Real HPE0-S60 Exam Dumps Questions
HP HPE0-S60 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
NEW QUESTION 11
Which statement about login redistribution is true?
- A. Login redistribution is used for login balancing when they are not distributed evenly over the FC links
- B. Login redistribution is available only If HPE Primera or HPE Alletra is connected directly to the HPE Synergy frame
- C. Login redistribution is a licensed feature and the number of licenses required depends on the number of active ports
- D. Login redistribution is supported only on the HPE Synergy Virtual Connect SE 32Gb FC Modules
Answer: D
NEW QUESTION 12
A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?
- A. HPE Virtual Connect SE 100 Gb F32 Module tor Synergy
- B. HPE Synergy 12 Gb SAS Connection Module
- C. Brocade 32GB Fibre Channel Switch Module for HPE Synergy
- D. HPE virtual Connect SE 32 Gb FC Module for Synergy
Answer: A
NEW QUESTION 13
Match HPE Superdome Flex system with its specific feature.
Answer:
Explanation:
NEW QUESTION 14
Match each HPE Synergy logical component with the definition.
Answer:
Explanation:

NEW QUESTION 15
Which statement about HPE Superdome nPars is true?
- A. Chassis in the same nPar can have different CPU configuration
- B. nPars are supported only with 3rd Generation Intel Xeon Scalable Processors
- C. Rack Management Controller is required Tor nPar configuration
- D. Chassis in the same nPar can have different memory configuration
Answer: C
NEW QUESTION 16
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Answer:
Explanation:
NEW QUESTION 17
An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement
Answer:
Explanation:
NEW QUESTION 18
Which statement about manual orchestration during the firmware update is true?
- A. It is supported only for logical enclosures with at least three frames
- B. It allows all the interconnect modules to be activated manually at the same time.
- C. It provides an ability to select and update one side of the Interconnect topology at a time
- D. It provides the ability to install an older firmware version than currently Installed In the interconnect
Answer: C
NEW QUESTION 19
Match HPE SimpliVity team with the definition.
Answer:
Explanation:
NEW QUESTION 20
Refer to the exhibit.
Which statement about this logical JBOD is true?
- A. After deleting this logical JBOD drives will he blocked for 12h m case this JBOD must be re-created
- B. After deleting this logical JBOD, its drives w not be available until a clean-up procedure 6 done
- C. This logical JBOD can be connected to multiple systems to formulate a snared datastore.
- D. This logical JBOD can be presented to the compute nodes in a different frame.
Answer: B
NEW QUESTION 21
As a result of the troubleshooting process, you recommend replacing, HPE Synergy Composer modules which HPE Synergy Composer 2 Why would you recommend this change?
- A. HPE Composer 1 cannot support remote frames, which doubles the configuration and management procedures effort
- B. HPE Composer 2 provides access to 105 interface that can be used for full management of HPE Composer 2 remotely
- C. HPE Composer 1 running HPE OneView 5 2 or later can support only 12 frames within a single management nog
- D. HPE Composer 2 can support more than the maximum 21 frames that are supported with HPE Composer 1 and HPE OneView.
Answer: C
NEW QUESTION 22
Your customer plans to expand an existing nPar based on a single HPE Superdome Flex chassis. Which statement about workload availability during expansion is true?
- A. Powered nPar can be expanded only if HPE Superdome Flex 280 is used
- B. Powered nPar can be expanded if it does not use HPE Persistent Memory
- C. HPE Superdome Flex does not support expansion of powered on nPars
- D. Online expansion is available only if RMC is used for management.
Answer: A
NEW QUESTION 23
Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61 Which statement about this update process is true?
- A. Before updating to 6,1, customer should increase memory size on the HPE Composer.
- B. To update to 6,1, the customer has to first update to 6 0, which is a milestone edition.
- C. The customer can update directly to 6,1, but HPE OneView downtime will be longer.
- D. The customer must check the HPE Composer version, as 61 is supported only with HPE Composer2.
Answer: D
NEW QUESTION 24
Which statement about an HPE Oneview support dump is true?
- A. Preview support dump is available only when creating an appliance support dump
- B. Support dump is a binary file that can be opened only in a dedicated application
- C. Appliance support dump by default contains a logical enclosure support dump
- D. Support dump can be created if HPE Virtual Connect modules are installed in the frame
Answer: B
NEW QUESTION 25
Match HPE SimpliVity term with the definition.
Answer:
Explanation:
NEW QUESTION 26
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. To use interconnect bay set 3, all compute nodes must be half-height
- B. For the given downlink speed, the maximum number of frames is reached
- C. The master modules are located in the interconnect bays 2 and 5
- D. Both master modules are located in the same HPE S ynergy frame
Answer: D
NEW QUESTION 27
Which statement about HPE Superdome Flex 280 is true?
- A. It can support up to two nPars with an external RMC.
- B. It supports 2 to 8 sockets in 2-socket increments.
- C. It must be equipped with at least 768 GB of memory.
- D. it cannot be managed using HPE OneView.
Answer: C
NEW QUESTION 28
Your customer wants to add a second HPE Synergy frame to an existing logical enclosure Based on a single HPE Synergy frame. The customer wants to use a highly available master setup.
Which procedures should De performed during the expansion process? (Select two.)
- A. Create a new logical interconnect group and enclosure group for two frames setup
- B. Re-parent an existing enclosure group to the new logical interconnect group.
- C. Modify an existing logical interconnect to include second HPE Synergy frame.
- D. Create a new logical enclosure based on both HPE Synergy frames.
- E. Move one of the master modules to the appropriate interconnect bay in the second frame.
Answer: C,D
NEW QUESTION 29
What is a limitation when creating a server profile?
- A. It is not possible to create shared volumes on demand through a server profile
- B. Administrator cannot define more than 8 connections within a server profile
- C. ILO management is limited to the integration with Active Directory or LDAP
- D. BIOS settings can be changed only when UEFI optimized is selected as boot mode
Answer: C
NEW QUESTION 30
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They also plan a vSAN deployment leveraging HPE D3940 Storage Modules and SSD drives The customer requested the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- An appropriate number of vSAN Standard licenses for each compute node
- One HPE O3940 Storage Module with 40 SSDs - All required cables and options Which statement about this request is true?
- A. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drives.
- B. vSphere licenses should be added, as vSAN licenses do not replace vSphere licenses
- C. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- D. vSphere Standard licenses should be replaced with Enterprise Plus licenses to enable vSAN
Answer: D
NEW QUESTION 31
Your customer has an HPE Synergy platform deployed and managed using HPE OneView. The customer also has HPE Superdome Flex with RMC deployed They plan to deploy a second nPar and HPE Superdome Flex 280 They plan to manage new components using HPE OneView What must be done to achieve this goal?
- A. The customer should deploy an HPE OneView appliance for HPE Superdome Flex management
- B. The customer must use IL05 to add HPE Superdome Flex systems to HPE OneView
- C. The customer must add a second Rack Management Controller for HPE Superdome Flex 280
- D. The customer has to add HPE Superdome Flex to the HPE OneView used to manage HPE Synergy
Answer: C
NEW QUESTION 32
Your customer manages HPE Synergy using HPE OneView. For one of its projects, the company purchased 50 HPE.
ProLiant DK385 Gen10 Plus v2. They plan to manage the new systems using HPE OneView as well.
What should the customer do to manage rack system using HPE OneView?
- A. Deploy an HPE OneView virtual appliance, and, after configuration, use it to manage only the rack systems.
- B. add the rack system to the HPE OneView instance used to manage HPE Synergy to centralize management of all systems.
- C. connect the rack system to an IPDU and add the IPDU to the HPE. OneView instance that is used for HPE synergy management.
- D. Deploy HPE OneView Global Dashboard and add the rack systems there, as AMD systems are not directly in HPE OneView.
Answer: A
NEW QUESTION 33
In the past a customer experienced a networking issue where network ports went down and came back up in quick succession.
Which HPE Virtual Connect SE 100 GD F32 Module for HPE Synergy feature can be configured to disable such ports?
- A. Storm control
- B. Port flap protection
- C. Pause flood protection
- D. sFlow
Answer: D
NEW QUESTION 34
......
Pass Your HPE0-S60 Exam Easily with Accurate PDF Questions: https://braindumps2go.actualpdf.com/HPE0-S60-real-questions.html
