[2022] Pass SAP C_TSCM42_67 Exam Updated 108 Questions
Get 2022 Updated Free SAP C_TSCM42_67 Exam Questions & Answer
SAP C_TSCM42_67 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
SAP PP Certification Exam Details:
| Exam Code | C_TSCM42_67 |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Sample Questions | SAP PP Certification Sample Questions |
| Exam Price | $550 (USD) |
| Number of Questions | 80 |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Duration | 180 mins |
| Level | Associate |
| Passing Score | C_TSCM42_67 - 63% |
NEW QUESTION 48
Which of the following requirements is supported by using process orders?
- A. Linkage of documents to orders
- B. Use of production/resource tools
- C. Use of reference operation sets
- D. Documentation of the production using an electronic batch record
Answer: D
NEW QUESTION 49
What do you have to consider regarding lot size procedures?
- A. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
- B. The procurement quantity of a lot size procedure can be specified using a safety time period profile.
- C. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
- D. If a long-term lot size is used, procurement is conducted with a long-term perspective.
Answer: C
NEW QUESTION 50
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
- A. Master record for serial numbers
- B. Production version
- C. Product cost collector
- D. Production supply area
- E. Repetitive manufacturing profile
Answer: B,C,E
NEW QUESTION 51
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
- A. Set "Container in process"
- B. Set "Container empty"
- C. Set "Container full"
- D. Set "Container in transport"
Answer: C
NEW QUESTION 52
With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)
- A. Resource selection
- B. Batch record
- C. Availability check
- D. Material identification and reconciliation
- E. Digital signature
Answer: B,D,E
NEW QUESTION 53
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- B. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
- C. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- D. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
Answer: B
NEW QUESTION 54
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).
What could be the reason?
- A. The repetitive manufacturing indicator has been set.
- B. There is no valid production version for this material.
- C. There are no planned orders or production orders present.
- D. There are no requirements present.
Answer: B
NEW QUESTION 55
Where can you define the default storage location for the material component of a production order? (Choose three)
- A. BOM header (product)
- B. Production version (product)
- C. Production supply area of a work center
- D. Routing
- E. Material master (component)
Answer: B,C,E
NEW QUESTION 56
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
- A. By the firming mechanism with the longer firming interval
- B. By the manual firming date
- C. It is predefined in Customizing.
- D. By the planning time fence from the material master
Answer: A
NEW QUESTION 57
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- A. Batch size optimization
- B. Midpoint scheduling
- C. Finite capacity scheduling
- D. Setup time reduction
- E. Lot size optimization
Answer: B,C,D
NEW QUESTION 58
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)
- A. Handling new procurement proposals that need to be created due to new requirements within the planning time fence.
- B. Handling existing procurement proposals within a planning time fence.
- C. Handling new requirements within the planning time fence.
- D. Handling existing procurement proposals outside the planning time fence.
Answer: A,B
NEW QUESTION 59
Which of the following master data is necessary for the creation of material reservations for production orders?
- A. Production/resource tools
- B. Production versions
- C. Routings
- D. Material master records
Answer: D
NEW QUESTION 60
What are characteristics of repetitive manufacturing? (Choose three)
- A. Continuous material consumption, production flow and output
- B. Production without using production orders and without status management
- C. Period-based planning of the quantities to be produced
- D. Automatic line loading based on capacity limits across all production lines
- E. Shop fabrication
Answer: A,B,C
NEW QUESTION 61
Which functions can be triggered before releasing a production order? (Choose three)
- A. Selection of a BOM
- B. Confirmation
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: A,C,E
NEW QUESTION 62
Which of the following statements best defines SAP ERP?
- A. SAP ERP is an application that a company can use to manage its business processes efficiently.
- B. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
- C. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
- D. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
Answer: A
NEW QUESTION 63
What could be a consequence of the confirmation of an operation?
- A. Rescheduling of the production order
- B. Update of the planned costs
- C. Settlement of the actual costs
- D. Reduction of capacity requirements
Answer: D
NEW QUESTION 64
Which of the following scheduling types can only be used in capacity planning?
- A. Only capacity requirements
- B. Midpoint
- C. Forward
- D. Backward
Answer: B
NEW QUESTION 65
Which of the following elements can be used in a process order? (Choose three)
- A. Process instructions
- B. Parallel sequences
- C. Suboperations
- D. Relationships
- E. Phases
Answer: A,D,E
NEW QUESTION 66
Which of the following statements about the planning functions available in SAP ECC is correct?
- A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
- B. Long-term planning (LTP) is a long-term form of forecast planning.
- C. Material requirements planning (MRP) includes automatic capacity leveling.
- D. Master production scheduling (MPS) refers to preferred planning of important materials.
Answer: D
NEW QUESTION 67
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Posting the goods receipt for the production order
- B. Rescheduling the operation
- C. Reducing the order quantity
- D. Confirming the operation
- E. Setting the status technically complete (TECO)
Answer: C,D,E