NEW QUESTION # 10
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.

  • A. Demand Review, by using the output of demand planning as input into calculations
  • B. Reconciliation Review, by providing inventory parameters for one consolidated plan
  • C. Management business Review, by providing the inventory targets for endorsement
  • D. Supply Review, by providing an input to supply network planning

Answer: A,D


NEW QUESTION # 11
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Change the past and future horizon of the levels in the time profile.
  • B. Change the numbering hierarchy of the period IDs in the time profile.
  • C. Add a new time profile level to the time profile.
  • D. Change the description of the attributes in the time profile.

Answer: A,D


NEW QUESTION # 12
Model configuration allows the attributes of a master data type to be assigned as key figures.Which features are relevant for this type of object?

  • A. This type of key figure is not usually stored and it cannot be set to editable.
  • B. This object is not exposed to the user in planning views or modeling.
  • C. This object contains user-defined criteria that monitor the running of business plans.
  • D. This object provides a single value for a unique planning combination.

Answer: D


NEW QUESTION # 13
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Target key figures for these snapshots are exposed to the user in planning views.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
  • D. Lag-based snapshots are created in the Configuration app for a fixed time range.

Answer: C,D


NEW QUESTION # 14
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
  • B. A time profile has to be activated so that the application job can proceed.
  • C. The assigned Planning Area must be active.
  • D. This application job can be run for multiple time profiles at once.

Answer: A


NEW QUESTION # 15
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.

  • A. Not respecting production capacity
  • B. Not adhering to maximum transport values
  • C. Violation of minimum aggregated inventory values
  • D. Violation of minimum resource utilization
  • E. Not-fully satisfied demands

Answer: C,D,E


NEW QUESTION # 16
You define fixing for a key figure.Which of the following functions are available for this key figure? Note:
There are 2 correct answers to this question.

  • A. Fixing is possible for a certain period, including all child values in the hierarchy.
  • B. Fixing is possible for a certain quantity of a key figure value.
  • C. Fixing is possible for manually editable key figures.
  • D. Fixing is possible for system editable key figures.

Answer: A,D


NEW QUESTION # 17
Which pre-processing steps can be used to cleanse historical sales data before generating a statistical forecast in SAP IBP?Note: There are 2 correct answers to this question.

  • A. Promotion Sales Lift Elimination
  • B. Substitute Missing with Mean or Median in Sales History
  • C. Bias Detection and Correction in Sales History
  • D. Intermittency Detection and Correction in Sales History

Answer: A,B


NEW QUESTION # 18
Which of the following are valid use cases for using the Realignment App?Note: There are 2 correct answers to this question.

  • A. Changing customer sources and reassigning customers to new DCs
  • B. Merging two locations into a new location
  • C. Using the realignment run to identify obsolete data
  • D. Removing outliers from the sales history of a reference product before transferring its sales to a new product

Answer: A,B


NEW QUESTION # 19
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.

  • A. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
  • B. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
  • C. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
  • D. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views

Answer: B,C


NEW QUESTION # 20
Which of the following are features of the S&OP process templates?Note: There are 2 correct answers to this question.

  • A. Each step depicted in the template can have tasks associated with it.
  • B. The S&OP process step can be started with an application job.
  • C. All process templates are assigned to dashboards.
  • D. New instances of templates allow for re-use of the same processes.

Answer: A,D


NEW QUESTION # 21
Using the import/export functionality means working with groups of items that are organized into collections.What is the best practice for managing collections?

  • A. You should delete collections after they have been transported.
  • B. A planning area with the copy operators assigned must be bundled in one collection.
  • C. Configuration items should be bundled in the collections based on the SAP IBP project stream.
  • D. A planning area with its time profile must be bundled in one collection.

Answer: B,D


NEW QUESTION # 22
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.

  • A. Keep the number of fairshare segments small.
  • B. Avoid using telescopic time buckets.
  • C. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
  • D. Split into multiple planning areas to support weekly vs. daily planning needs.
  • E. Increase the use of incremental lot size beyond the frozen horizon.

Answer: B,C,D


NEW QUESTION # 23
Which are the mandatory preconditions for an attribute that can be used for saving the segmentation results?Note: There are 2 correct answers to this question.

  • A. The Business Meaning of the attribute has been specified.
  • B. The attribute should be assigned to all planning levels.
  • C. The attribute belongs to a simple or compound master data type.
  • D. The attribute should be a non-key attribute of the master data type.

Answer: C,D


NEW QUESTION # 24
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.

  • A. Copying multiple key figures can be processed sequentially.
  • B. Copying multiple key figures on different planning levels is not possible.
  • C. If necessary source key figures values are disaggregated.
  • D. If necessary target key figures values are disaggregated.

Answer: A,C


NEW QUESTION # 25
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.

  • A. Transportation lead times
  • B. Minimum lot size
  • C. Adjusted transport receipts
  • D. Maximum lot size
  • E. Aggregated constraints

Answer: A,B,C


NEW QUESTION # 26
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

  • A. A special key figure marked as an aggregate key figure (aggregate constraint)
  • B. A currency conversion key figure, such as exchange rate
  • C. A forecast metric key figure, such FCSTMAPE
  • D. A unit of measure key figure, such as UOMCONVERSIONFACTOR

Answer: A,D


NEW QUESTION # 27
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.

  • A. Response Planning
  • B. Sales and Operations Planning
  • C. Demand Sensing
  • D. Demand Driven Replenishment
  • E. Inventory Optimization

Answer: B,C,E


NEW QUESTION # 28
Which functional capabilities are included in SAP IBP for response and supply?Note: There are 2 correct answers to this question.

  • A. Planning with Product Allocations
  • B. Gating Factors
  • C. Analyze Supply Usage
  • D. Detailed Production Scheduling

Answer: B,C